| 1786 | 22 | 3 | 2019-03-11 | 00:00:09 | 9280.50 | First aid kit inspection due on 14.mar 19. | 26 | 2019-03-13 | 9280.50 | Completed. Next inspection due on 12 mar 20. | 26 | 0 | 00:00:09 | 15:07:17 | 15:08:44 | Detalji |
| 1787 | 22 | 3 | 2019-03-11 | 00:00:09 | 9280.50 | Visual inspection of T/B vertical fin spar due | 26 | 2019-03-11 | 9280.50 | Completed | 26 | 0 | 00:00:10 | 15:09:41 | 15:10:11 | Detalji |
| 1788 | 22 | 3 | 2019-03-11 | 00:00:09 | 9280.50 | ACFT battery PMCS due on 12 mar 19 | 26 | 2019-03-11 | 9280.50 | Completed | 26 | 0 | 00:00:14 | 15:11:35 | 15:12:08 | Detalji |
| 1789 | 22 | 1 | 2019-03-13 | 00:00:11 | 9280.50 | M/R high vibration white P/C sherten for 3 flats | 26 | 2019-03-13 | 9280.50 | White P/C link shopten 3 flats inspection. OK | 26 | 0 | 00:00:11 | 15:15:19 | 15:16:39 | Detalji |
| 1790 | 22 | 1 | 2019-03-13 | 00:00:12 | 9280.50 | M/R vibration cut of limit white P/C shorten hor 0.5 flat. | 26 | 2019-03-13 | 9280.50 | White P/C link shorten 0.5 flats and wihte drag brace AFT 2 flats inspection OK | 26 | 0 | 00:00:12 | 15:18:03 | 15:19:22 | Detalji |
| 1791 | 22 | 1 | 2019-03-13 | 00:00:12 | 9280.50 | M/R vobration cut of limit! | 26 | 2019-03-13 | 9280.50 | Red drag vrace AFT 2 flats inspection OK. | 26 | 0 | 00:00:12 | 15:20:08 | 15:20:52 | Detalji |
| 1792 | 22 | 1 | 2019-03-13 | 00:00:13 | 9280.50 | M/R vibration out of limit! | 26 | 2019-03-13 | 9280.50 | White drag brace AFT 2 flats, red drag brace BCT AT Witihac value. Inspection OK. | 26 | 0 | 00:00:13 | 15:21:29 | 15:24:28 | Detalji |
| 1793 | 22 | 1 | 2019-03-13 | 00:00:13 | 9280.50 | M/R high vertical vibtaion! | 26 | 2019-03-19 | 9280.50 | Temporory installed unseruiceablle blade S/N:A-3637. See page 10,11,12. | 26 | 0 | 00:00:15 | 15:25:10 | 12:59:56 | Detalji |
| 1794 | 22 | 3 | 2019-03-18 | 00:00:15 | 9280.50 | CHECK balance of stabilizer bar. | 26 | 2019-03-19 | 9280.50 | Completed see page 13. | 26 | 0 | 00:00:12 | 15:26:12 | 10:51:06 | Detalji |
| 1795 | 22 | 3 | 2019-03-18 | 00:00:15 | 9280.50 | CHECK overal condition of main rotor controls and mast area. | 26 | 2019-03-19 | 9280.50 | Completed (see obrazac BH 2408-13-2, PG.14) | 26 | 0 | 00:00:13 | 15:27:17 | 15:28:31 | Detalji |
| 1796 | 22 | 3 | 2019-03-18 | 00:00:15 | 9280.50 | CHECK overal condition of XMSN mounts friction dampers and lift link bearings and bushing. | 26 | 2019-03-19 | 9280.50 | Completad | 26 | 0 | 00:00:13 | 15:30:45 | 15:31:14 | Detalji |
| 1797 | 25 | 1 | 2019-03-20 | 00:00:08 | 7991.10 | 90 degree G/B mount hole insp.is overdue | 30 | 2019-03-22 | 7999.10 | completed | 30 | 0 | 00:00:11 | 08:32:27 | 09:31:22 | Detalji |
| 1798 | 22 | 1 | 2019-03-19 | 00:00:15 | 9280.50 | Temporary installed (wht) M/R blade sin: A-3637 in unserviceable condition. | 26 | 2019-03-29 | 9280.50 | Replaced unseryiceable M/R blade with M/R blade SN:BHFS 048932 and SN:049716 (See BH 2408-13-2, PG 16.17 and 18) | 26 | 0 | 00:00:09 | 09:03:09 | 13:03:59 | Detalji |
| 1799 | 22 | 3 | 2019-03-20 | 00:00:09 | 9280.50 | Forward cross tube clearance lower than required cross tube inspeczion required. | 26 | 2019-04-11 | 9280.50 | Izvršena kontrolisana zamjena poprečnih cijevi stajnog trapa između helikoptera A-2622 i A-2619 u skladu sa naređenjem br ZS i PZO broj:16-14-16-04-50-38-22/19 od 10.04-2019.godine | 26 | 0 | 00:00:13 | 09:06:38 | 14:49:26 | Detalji |
| 1800 | 22 | 1 | 2019-03-20 | 00:00:14 | 9280.50 | T/R vibration out of limit (0,26 ips) | 26 | 2019-03-20 | 9280.50 | Target blade (red) removed 5 gr and added 3 gr to barack blade (whe) to span bracket. | 26 | 0 | 00:00:14 | 09:28:11 | 09:33:33 | Detalji |
| 1801 | 22 | 1 | 2019-03-20 | 00:00:15 | 9280.50 | Engine RMP at flight idle set too high (73% RMP) | 26 | 2019-03-20 | 9280.50 | Completed (adjusted to 69% RPM). inspect OK! | 26 | 0 | 00:00:15 | 09:35:40 | 09:37:20 | Detalji |
| 1802 | 9 | 3 | 2019-03-21 | 00:00:08 | 962.29 | Provjera vibracija repnog rotora na zemlji | 5 | 2019-03-21 | 962.40 | Izvršena provjera i mjerenje vibracija RR uređajem Chadwick Helmut 8500+C. Izvršeno balansiranje RR pri čemu su ustanovljene balansne mase u korjenu krakova: crveni krak 97,2 g, plavi krak 21.0 g i zeleni krak 0 g. Izmjerene vibaracije nakon podešavanja 0,067 IPS | 5 | 0 | 00:00:12 | 09:01:42 | 09:04:11 | Detalji |
| 1803 | 9 | 3 | 2019-03-21 | 00:00:08 | 962.29 | Provjera vibracija glavnog rotora na zemlji | 5 | 2019-03-21 | 962.40 | Izvršeno mjerenje vibracija GR na zemlji uređajem Chadwick Helmut 8500+C. Izmjerene vibracije (korkcija): vertikalne 0.076 IPS, lateralne 0.096 IPS | 5 | 0 | 00:00:12 | 09:05:09 | 09:06:54 | Detalji |
| 1804 | 9 | 2 | 2019-03-21 | 00:00:10 | 962.29 | Instalisana oprema za mjerenje vibracija na helikopteru Mi-8T Chadwick Helmut 8500+C | 5 | 2019-03-21 | 962.40 | Deinstalisana oprema za mjerenje vibracija na helikopteru Mi-8T Chadwick Helmut 8500+C | 5 | 0 | 00:00:13 | 09:08:06 | 09:09:11 | Detalji |
| 1805 | 7 | 1 | 2019-03-22 | 00:00:12 | 998.36 | Curenje ulja ispod hladnjaka u odsjeku VR-14, davac opiljaka. | 25 | 2019-04-02 | 998.36 | Izvršeno dotezanje priključka ulja sisteme na lijevom davaču opiljaka SS-78 | 26 | 0 | 00:00:10 | 13:07:37 | 14:05:53 | Detalji |